DLC released the latest version of technical specifications V3.1
Label: formaldehyde testing company, IES light distribution curve, DLC certification, lighting energy star certification, CCC/CQC certification
DLC (Design Lighting Consortium, American Lighting Design Alliance) officially announced and implemented the latest technical specification V3.1 version (Technical Requirements Table V3.1).
Compared with the old version of the specification, the latest version of V3.1 has four changes worth paying attention to.
Variation 1
The category of "LED replacement parts with E39 spiral lamp caps" is added. According to the type of replacement finished lamps, the built-in power supply (Type B) and the external power supply (Type C), this large category contains a total of 13 different replacement parts. However, LED replacement parts (Type A) that are directly compatible with HID ballasts are not within the scope of this category. This category is not yet able to apply for the DLC Premium premium version.
Variation 2
According to the number of tubes tested in the lamp panel, the scope of approval of LED tubes has been expanded. Both 1.2-meter lamps and 0.6-meter lamps are allowed to be used in the lamp panel with 2, 3, and 4 lamps.
Variation 3
In the category of replacement parts for indoor luminaires, Direct Linear Ambient Luminaires have been added. Such replacement parts are not allowed to have lamp holders or pins.
Variation 4
In the category of outdoor lamps, side-emitting wall lamps (Non-Cutoff and Semi-Cutoff) are added, and the calculation of luminous efficiency has changed. The luminous flux is based on the lumens of 0°-90°, and the evaluation of the area lumens percentage is based on 0° -90° lumens shall prevail.
DLC certification expands the scope of certification of LED tubes based on the number of tubes tested in the lamp panel.
Ward Testing currently has three major testing bases, located in Shenzhen Nanshan, Bao'an (Shenzhen Zhuntest Testing was established in September 2008) and Dongguan Songshan Lake High-tech Industrial Park, with a 1,000 square meters safety laboratory and 400 square meters of light performance. And energy efficiency laboratory, 3000 square meters physical and chemical and environmental laboratory, 500 square meters EMC laboratory and 3500 square meters performance laboratory under construction; among them, there are more than 10 doctors and graduate students, and more than 20% of junior and intermediate titles, and more than eight years Industry experience personnel account for more than 25%, and 100% of the personnel have a college degree or above, providing the latest one-stop integrated service model for global enterprises.
Ward Testing provides safety testing, EMC certification, EMC rental, light performance and energy efficiency testing, IES light distribution curve, UL certification for LED products, and Energy Star for lighting in the four major areas of industrial products, consumer products, trade security and life sciences. Certification, DLC certification, environmental testing, physical and chemical testing, as well as laboratory construction, qualification application, technical support and training, application software development and big data platform construction, and many other comprehensive one-stop third-party service organizations. It is the largest formaldehyde testing agency in Dongguan company.